Saturday, April 17, 2010

B & W and Peranakan House progress.

Not quite ready for tea on the terrace but getting there.  If you are wondering,  the plants are strategically positioned to prevent Gek cracking her head on the eaves of the house. 

The front windows are nearing completion.  The milling machine is coming into its own here.  144 2mm diameter holes to drill at 6 mm spacing for the louvres.  Each one will twist open and close.  Magic.  Gek has designs for the below window panels.  Another work of art.

No comments:

Post a Comment