Wednesday, October 10, 2012
sPICE - October 2012
Most the piling done for the right side of the site's new buildings. Still tidying up the left side. Phase 1 - do up the indoor stadium, seen here as a landed 'space ship'. Phase 2 - do up the aquatic centre and build shops on the right of the picture. Phase 3 - New hotel and convention centre on the left of the picture.
Subscribe to:
Posts (Atom)